critical path

英 [ˌkrɪtɪkl ˈpɑːθ] 美 [ˌkrɪtɪkl ˈpæθ]

n.  (又快又省完成项目必须遵循的)关键程序

计算机经济



牛津词典

noun

  1. (又快又省完成项目必须遵循的)关键程序
    the order of work that should be followed to complete a project as fast and as cheaply as possible

    双语例句

    1. Critical path is typically the requirement that user-facing functionality be operational in order for the solution to be of value to the end user.
      关键路径是为了解决方案对最终的用户有价值而使面向用户的功能按照一定的顺序进行操作的需求。
    2. Find out which methods of which classes are on the critical path.
      找到哪些类的哪些方法位于关键路径上。
    3. We allow an additional time buffer associated with the critical path, and not the other tasks.
      我们允许一个在关键路径上添加附加时间来进行缓冲,但并不是在某一任务中添加时间。
    4. Although I have reduced the risk of bottlenecks and provided some additional lead time to the critical path, I haven't added any time to the overall project plan.
      虽然我已经降低瓶径的风险并在关键路径上提供了一些额外的时间,但是我在整个项目计划中没有增加时间。
    5. As this title suggests, these features determine the critical path.
      如此题目所暗示的,这些特性确定了关键的路径。
    6. The simplest approach to test case prioritization is identification of critical path.
      最简单的处理测试用例优先权的方法是关键路径的识别。
    7. In our original waterfall project we had a critical path that aligned key activities in our project with key activities in their project.
      在我们初始的瀑布法项目中,我们有了一个关键路径,将我们的项目中的关键活动与其它项目中的关键活动关联在一起。
    8. This places the "orange" resource on the critical path.
      这就在关键路径上放置了一个“桔红色”资源。
    9. Critical path is useful in regression testing and other severely time-constrained testing.
      关键路径在回归测试和其它有严格时间控制的测试中十分有用。
    10. Profiler results help you identify the critical path of your application; that is, the code that is executed most of the time.
      分析器结果可以帮助标识应用程序的关键路径;即大部分时间所执行的代码。
    11. Identifying and discuss critical path items on each job before mobilization.
      动员进厂之前,辨别并讨论每项工作的关键路径项。
    12. B.Expand more of the critical path tasks so they cost more.
      扩大关键路径任务,使它们花费更多。
    13. What about dependencies and critical path analysis?
      依赖和关键路径分析如何去做?
    14. Based on critical path method authors provide improvement method on progress compilation methods of flow process without steps which gains satisfying effect.
      基于关键路线法提出了无节拍流水施工进度计划编制的改进方法,取得了满意的效果。
    15. In the practical engineering processes, the amount of resources is strictly limited, so in the actual engineering, the traditional CPM can not give the correct total float and critical path.
      在实际工程中工序的资源量是受到严格限制的,传统的CPM法不能给出正确的工序总时差和关键路线。
    16. Analysis of the Critical Path of Fuzzy Network Plan Base on S-type Membership
      基于S型隶属度函数的模糊网络计划关键线路分析
    17. Research on Complex Product Manufacture Scheduling Based on Dynamic Critical Path
      基于动态关键路径的复杂产品制造调度研究
    18. He should also be able to identify which tasks are on the critical path.
      他还应能识别哪项任务位于关键路径上。
    19. The Research of Grid Task Scheduling Algorithm Based on Critical Path
      基于关键路径的网格任务调度算法研究
    20. Do you adhere to a critical path in developing and introducing your new products?
      贵公司会依循关键路径来发展与导入新商品吗?
    21. Basic project planning, critical path, critical chain, or PERT analysis may mitigate such failings.
      基本的项目计划、关键路程、重要链子,和计划评审技术分析也许会减低失败的几率。
    22. Concurrent Code Design Method Base on Critical Path and Deadlock-free
      基于关键路径与无死锁的DSP代码并行设计方法
    23. To delivery, and as a consequence puts test activities unnecessarily on the critical path of the project.
      交付而完成测试准备,并且作为将不必要的测试活动放在项目的关键路径上的结果。
    24. On our most projects Critical Path Method ( CPM) is used for scheduling.
      在我们的大多数工程项目中都采用统筹法(关键路线方法,简称CPM)排计划。
    25. Free float theorem and algorithm of seeking the k-th order critical path
      自由时差定理与k阶次关键路线的求法
    26. This method of analysis takes account of the problem that on construction projects that the critical path may change as the project proceeds or there may be one or more critical paths.
      这种方法还考虑到关键路径有可能随着工程的进展发生变化,或者有时会有不止一条关键路径出现的情况。
    27. Through the use of critical path method and the process of mapping network model, analyse the progress of activities, optimize the process model for the goal of the cost and time.
      通过运用关键路径法和绘制网络图对过程模型中活动进度安排进行分析,并且以时间-成本为目标对过程模型进行优化。
    28. The critical path method was originally developed to solve scheduling problems in an industrial setting.
      关键路线方法最初的发展是为了解决一项工业安装的安排问题。
    29. This paper analyzes the time-scaled network plan applied to confirm critical path, gain time factors, control network plan and so on.
      就时标网络计划在工程中如何确定关键线路、分析工作时间参数、进行网络计划的控制等进行阐述。